Structural Engineering for Major Refurbishments
Residential Refurbishments in City of London. Refurbishment design should distinguish damage requiring repair from historic movement and from the effects of proposed alterations. Inspect concealed bearings and connections where their condition could affect the design.
Structural considerations
For flats in the Barbican or Golden Lane estates, consult building-specific records and management requirements before altering walls, floors or services. Do not assume a particular concrete or prestressing system across an estate. In historic City buildings, investigate existing materials, previous alterations and constraints on opening-up work.
Permissions and approvals
Confirm the applicable adopted planning policies, site designations, Article 4 directions and application requirements with the local planning authority. Planning permission, listed building consent and Building Regulations approval are separate. Conservation-area designation does not automatically mean every internal alteration needs planning permission. A structural design supports the relevant applications; it does not grant consent. Structural calculations and drawings support assessment by the relevant building control body. They do not constitute approval or a completion certificate. Other requirements, including fire safety, ventilation, drainage and access, need coordination with the wider design team. Higher-risk buildings have a separate Building Safety Regulator process. Work to a party structure, a boundary wall or excavation near adjoining buildings may engage the Party Wall etc. Act 1996. Whether notice is needed depends on the proposed work and statutory tests. A surveyor can advise on notices and any dispute procedure; not every project requires an award or two surveyors. Structural drawings provide technical input to that process. Check lease, freeholder, estate and other third-party requirements for the property. Agree responsibilities for temporary works, site investigation, waterproofing and other specialist designs where relevant; these are not automatically included in a structural appointment.
Related services and areas
Common questions
Should historic cracks always be repaired structurally?
First establish their cause, significance and whether movement is ongoing. Monitoring or further investigation may be appropriate. Repairs and strengthening should follow the assessment rather than conceal evidence of an unresolved problem.
What local conditions matter for residential refurbishments in City of London?
For flats in the Barbican or Golden Lane estates, consult building-specific records and management requirements before altering walls, floors or services. Do not assume a particular concrete or prestressing system across an estate. In historic City buildings, investigate existing materials, previous alterations and constraints on opening-up work.
Which approvals should I check?
Confirm the applicable adopted planning policies, site designations, Article 4 directions and application requirements with the local planning authority. Planning permission, listed building consent and Building Regulations approval are separate. Conservation-area designation does not automatically mean every internal alteration needs planning permission. A structural design supports the relevant applications; it does not grant consent.
Who provides approval and construction certification?
Structural calculations and drawings support assessment by the relevant building control body. They do not constitute approval or a completion certificate. Other requirements, including fire safety, ventilation, drainage and access, need coordination with the wider design team. Higher-risk buildings have a separate Building Safety Regulator process.
How long will my project take?
The programme depends on the agreed scope, survey access, investigations, specialist inputs and the approval route. Ask for a project-specific programme with the fee proposal. Design, statutory procedures and construction are separate stages; no approval date is guaranteed.
Policy and approval sources
Bourdon Hill ยท Structural engineering guidance
Request a fee proposal